Custom Aluminum Alloy Die Casting Auto Spare

Short Description:

Mold Material: SKD61, H13

Cavity: Single or multiple

Mold Life Time: 50K times

Product Material: 1) ADC10, ADC12, A360, A380, A413, A356, LM20, LM24
2) Zinc alloy 3#, 5#, 8#


Product Detail

Product Tags

Specifications

Mold Material SKD61, H13
Cavity Single or multiple
Mold Life Time 50K times
Product Material 1) ADC10, ADC12, A360, A380, A413, A356, LM20, LM24
2) Zinc alloy 3#, 5#, 8#
Surface Treatment 1) Polish, powder coating, lacquer coating, e-coating, sand blast, shot blast, anodine
2) Polish + zinc plating/chrome plating/pearl chrome plating/nickel plating/copper plating
Size 1) According to customers’ drawings
2) According to customers’ samples
Drawing Format step, dwg, igs, pdf
Certificates ISO 9001:2015 & IATF 16949
Payment Term T/T, L/C, Trade Assurance

Our advantages

We now have 200 customers from all over the world.
1. We have own factory and 80% of staff in our company worked for more than 10 years.
2. We provide a competitive price.
3. High precision, tolerance can be within ±0.01mm.
4. 14 years’ export experience.
5. Small order also is welcomed.
6. We provide one-stop service, including mold and assembly.
7. All your information is confidential, and we can sign NDA as well

Why Choose Us

One-stop Solution
From mold design, mold making, machining, fabrication, welding, surface treatment, assembly, packing to shipping

Quality Guarantee
We have a professional team to control the quality. Experienced engineers, precision machines, CMM and closed-loop QC system

Customer Service
Every client is served by a specialized sales for timely technical support and after-sales service

FAQ

Q1. Are you a factory or trade company?
Welcome to visit our factory.

Q2. What kind of production service do you provide?
Mold making, die casting, CNC machining, stamping, plastic injection, assembly, and surface treatment.

Q3. How about the lead time?
Mold: 3-5 weeks
Mass production: 3-4 weeks

Q4. How about your quality?
♦We have got ISO9001:2015 and IATF16949 certificates.
♦We will make the operation instruction once the sample is approved.
♦We will 100% inspect the products before shipment.
♦Transactions can be through Alibaba’s trade assurance.

Q5. How long should we take for a quotation?
After receiving detailed information(your 2D/3D drawings or samples), we will quote you within 2 days.

Q6. What is your quotation element?
Drawings or Sample, Material, Finish, and Quantity.

Q7. What is your payment term?
Mold: 50% prepaid, balance after sample approval.
Goods: 50% prepaid, balance T/T before shipment.


  • Previous:
  • Next: